英语资讯
News

英语文摘:Brazil announces delay in operation of its third nuclear plant

Source:    2013-06-08   English BBS   Favorite  

RIO DE JANEIRO, June 7 (Xinhua) -- The Brazilian government confirmed on Friday a two year delay in the inauguration of Angra 3, the country's third nuclear power plant.

Instead of becoming fully operational by June 2016, the plant, like Brazil's other nuclear plants Angra 1 and 2 located in Angra dos Reis, some 114 kilometers from Rio, will only be ready for operation two years later in May 2018, according to Othon Luiz Pinheiro, president of the state-owned company Eletronuclear.

The official blamed the delay on new safety requirements and equipment adaptations, which called for a longer construction period.

The construction of Angra 3 at some 12.9 billion reais (6.05 billion U.S. dollars) resumed in 2010 after suspension for years. The plant is designed to generate over 12 million megawatt a year.

Brazil had serious energy supply problems at the beginning of the 2000s, which led to nationwide energy rationing for one year. The energy crisis resulted in the construction of several new hydroelectric power plants and thermal power plants for backup.


将本页收藏到:
上一篇:英语文摘:One killed in shooting at U.S. California college
下一篇:英语文摘:U.S. teacher in Shanghai accused of molestation
最新更新
论坛精彩内容
网站地图 - 学习交流 - 恒星英语论坛 - 关于我们 - 广告服务 - 帮助中心 - 联系我们
Copyright ©2006-2007 www.Hxen.com All Rights Reserved