英语资讯
News

英语文摘:BP begins "static kill" to permanently plug ruptured well in Gulf of Mexico

Source:  Onion  2010-08-04   English BBS   Favorite  

HOUSTON, Aug. 3 (Xinhua) -- British oil giant BP said Tuesday it had begun the so-called "static kill" procedure to permanently plug the ruptured well in the Gulf of Mexico.

The engineering procedure of sealing the underwater gusher by pumping mud into the well from above started at about 4 p.m. ET, BP said in a news release.

The London-based company said the move was carried out with the approval of U.S. Coast Guard Admiral Thad Allen, who is tasked to handle the oil spill.

The "static kill" followed a crucial test that determines whether the process will work. The "injectivity test", initially planned for Monday, was postponed to Tuesday because of a small hydraulic leak discovered in the containment cap that kept the damaged well shut.

Video image captured August 3, 2010 from a BP live feed shows the containment capping stack on the blown-out oil well in the Gulf of Mexico. BP said it started pumping drilling mud on Tuesday as part of the static kill operations hoping to plug the blown-out oil well for good.

The hydraulic leak had been fixed by crews overnight, according to Allen. The 'static kill' process would last between 33 and 61 hours, he said.

The static kill method of pouring mud, possibly followed by cement, into the well from above would ideally push all the oil back into the reservoir and help seal the well.


将本页收藏到:
上一篇:英语文摘:Clashes bring huge tension along Israel-Lebanon border
下一篇:英语文摘:UN chief expects six-party talks to resume early
最新更新
论坛精彩内容
网站地图 - 学习交流 - 恒星英语论坛 - 关于我们 - 广告服务 - 帮助中心 - 联系我们
Copyright ©2006-2007 www.Hxen.com All Rights Reserved