英语资讯
News

新概念英语mp3听力下载第二册lesson 64

Source: 恒星英语学习网  Onion  2009-05-08  我要投稿   论坛   Favorite  

First listen and then answer the question.
Why was the first tunnel not completed?

    In 1858, a French engineer, Aime Thome de Gamond, arrived in England with a plan for a twenty-one-mile tunnel under the English Channel. He said that it would be possible to build a platform in the centre of the Channel. This platform would serve as a port and a railway station. The tunnel would be well-ventilated if tall chimneys were built above sea level. In 1860, a better plan was put forward by an Englishman, William Low. He suggested that a double railway-tunnel should be built. This would solve the problem of ventilation, for if a train entered this tunnel, it would draw in fresh air behind it. Forty-two years later a tunnel was actually begun. If, at the time, the British had not feared invasion, it would have been completed. The world had to wait almost another 100 years for the Channel Tunnel. It was officially opened on March 7,1994, finally connecting Britain to the European continent.


将本页收藏到:
上一篇: 新概念英语mp3听力下载第二册lesson 63
下一篇: 新概念英语mp3听力下载第二册lesson 65

最新更新
论坛精彩内容
网站地图 - 学习交流 - 恒星英语论坛 - 关于我们 - 广告服务 - 帮助中心 - 联系我们
Copyright ©2006-2007 www.Hxen.com All Rights Reserved